Greenwich and Woolwich foot tunnel refurbishment scheme

Bespoke GRP spiral guttering

Design & Display Structures had been awarded the contract by Dean & Dyball Civil Engineering to manufacture and install bespoke GRP moulded helical gutters to the Greenwich and Woolwich foot tunnel spiral staircases.

Each tower requires some 50m and is factory formed so that the installation phase does not place any stresses on the required final shape designed to take residual water to disposal hoppers at the lowest position.

For further information on architectural GRP cladding systems and mouldings please contact Allan Curtis 07718 320184.

Top